In the Mars Yaşam and Office Areas project, one of Kocaeli’s prominent mixed-use developments, our comprehensive technical application works for the heating and cooling systems were successfully completed.
Within the scope of the project;
During this process, manufacturing residues, oil, sludge, and particle deposits within the system were removed using special chemicals and a controlled circulation method, ensuring maximum efficiency and safe operation before the initial commissioning of the system.
Following the pre-cleaning operations, the installation and equipment were placed under protection in order to ensure long service life and resistance against corrosion. Thanks to the applied inhibitor-based protection processes;
All works were carried out in coordination with the relevant engineering team, in accordance with the project technical specifications and international mechanical installation standards.
We would like to thank the valuable engineering team and project stakeholders who preferred our company in this prestigious project, and we hope our cooperation will continue for many years.